Sunday, December 27, 2009
No more exposed concrete
Friday, December 25, 2009
Sleepover, Anyone
Thursday, November 26, 2009
Settling In
Sunday, October 25, 2009
Kitchen Accomplished
When we first moved to the house, I was able to get a sink put in, with one set of drawers and a counter top that we wanted to try (WilsonArt HD). We also had an old dresser drawer set, and a rolling table for the microwave. Once Diana and the grandkids needed to move in with us, I quickly bought a stove, refrigerator, and dishwasher to add to the mix, but they were pure function, no beauty.
Another note here. Most of the walls in the kitchen are concrete. To make things go easier for wiring, and hanging cabinets, we put in the only studded wall over concrete in the whole house. You lose a few inches of space, but it worked out very well, especially when I changed the design a bit and had to move, and rewire the under counter lighting.
I had never put in a kitchen before, so I was pleased with how it came out. I sure am glad I watched all those home improvement shows about installing a kitchen. They really helped. The only thing I have left to do is add the tiles to the backsplash areas. I did that in our old house, so I don't expect any trouble. I just have to wait for a weekend when I don't have anything else to do, or anywhere else to be. I guess it will be a while!
Sunday, October 18, 2009
Dust Everywhere
In addition, I will be using a different technique on the ceilings of those rooms. I will describe that later. Progress will come swiftly over the next few weeks. We expect to complete the house in the next few weeks so we can have an appraisal in preparation for rolling over the construction loan to a regular mortgage.
Sunday, September 20, 2009
Interior Finish Work
By far, the thing that is taking the longest amount of time is the interior finish work. I am doing nearly all of it with a little help from my oldest son. We really only get to work on it on Saturdays, and we generally spend about 12 hours each weekend. Once all of the other workers and contractors were finished, we were left with bare drywall and exposed concrete, and of course, a bare concrete floor. Above you can see how we cover the walls with drywall mud to smooth out the surface before we paint. This usually takes 1 rough coat, and 2 - 3 fill-in coats of mud to get it right.
Sunday, September 6, 2009
The Exterior
I built this house to self regulate it's internal temperature through a technique called Earth Tubes. You can see the white pipes sticking up through the top of each module. I connected these to corrugated black plastic pipes that were over 100 feet each, and wrapped them around the building to stick out of the ground on the sides of the house. There are matching holes in the wall near the floor of each module that were similarly connected and routed. Unfortunately, I should have used the schedule 40 white pipe throughout because it would not have crushed when the dirt was set in place the way the corrugated stuff did. Some day if I have to dig it up for some other reason, or I inherit big bucks, I will try to fix them.