3rd and Final Module

This is a picture of the inside of the 3rd module from inside the 2nd module. Notice the opening I mentioned previously, and the wheels indicate where the trailer is positioned that is used to lift the roof forms. Notice also all of the gravel inside, and the footers. As will be seen later, this gravel base will eventually come up to the footer level before the floor is poured.
This is a closer look at the internal forms and structures set in place before the concrete is poured.
Parts and forms everywhere.
This a a great shot of the interior of the 1st and 2nd module. There is plenty of light coming in these windows.
Wrapping it up. Once they pulled everything out of the 3rd module, they pack the roof forms on the trailer and move on to their next job. The wall forms are stored and shipped in a standard big rig trailer.