This is the pumper truck that moved the concrete up to the roof. Unfortunately, it kept getting clogged and as a result, we had several concrete trucks backed up, allowing the concrete to get old. It made the final product a little rough, but the strength was unaffected.
Here is the beginning of the 3rd module. The front wall forms are not installed yet and this allows a great view of the dome structure.

No comments:
Post a Comment